Night mode

Insiders Project - Season 1 Episode 3 Top of Kyiv's South Bridge

Trailer
The shooting crew follows through the internal constructions of the South Bridge. Having passed the whole bridge inside, the team goes up vertical cables 300 meters long. A hand-made construction for ascent, strong arms and self-confidence - these are the only things the team relies on. Throwing a climbing hook with a rope, the shooting crew gets to the peak using a hand-made ladder.

First Air Date: Nov 27, 2016

Last Air date: Nov 27, 2016

Season: 1 Season

Episode: 10 Episode

Runtime: 26 minutes

IMDb: 0.00/10 by 0.00 users

Popularity: 0.263

Language: Russian